Last Revised on October 2, 2006
| Complete? | Task | Timeframe |
|---|---|---|
![]() |
Background Info/Resources | |
![]() |
Prepare Budget Estimate | November |
![]() |
Floor Plan Complete | November |
![]() |
Set Plan Complete | November |
![]() |
Recruit Construction Crew | December |
![]() |
Recruit Paint Crew | December |
![]() |
Plan First Construction Session | November |
![]() |
Submit Bio for Playbill | November |
![]() |
Set Sketches | November |
![]() |
Set Inventory | Before first work day. |
![]() |
Set Materials | Before first work day. |
![]() |
First Shopping Trip | Before first work day. |
![]() |
Submit crew names | January |
![]() |
Attend Debriefing Meeting | Date is determined by the Producer |
![]() |
Return Task List | Return to the Task List Manager at Debriefing Meeting. See Calendar for the exact date. |
Supplies: Find suppliers in the NYNEX Business-to-Business yellow pages, an excellent resource as it contains listing of manufacturers and wholesalers who are often more cooperative than retailers. In most cases, the only requirement for buying from the wholesaler is a sales tax number, which the SUMC has. It is often more effective to indicate the affiliation with the SUMC rather than the Savoyards.
Large cardboard sheets. Current practice is to tape box cardboard together (on back, with duct tape, on front, with masking tape). Glue small pieces across seams on back. Note: leave space to attach 1x3 bracing. Glue boards to cardboard extensively AND staple from front. If hanging, screw eyes go into the edge of the board. Connect all 1x3s with molding (1/4 x 1) and screws, hang by wire at two or more points.
Supplies: Charrette, 44 Brattle St., Cambridge, MA, telephone 617-495-0200. Store hour 8-8:30 M-F, 8:30-5 Sat, 1-5 Sun. For oversize photocopies, photographic enlargements, etc.
Kirks Lane Lamp Parts Co., Box 1073, Bensalem, PA 19020, telephone 215-785-1251. Wholesale supplier of lamp parts and supplies. Very reasonable prices. Write or call for catalogue. $25.00 minimum order.
The Fair, 137 West Boylston St. (Rt. 12), West Boylston, MA. Seedy department store with an excellent close-outs section: Latex paint at $1 per gallon.
Charles H. Stewart - North Andover Ma. - rental agent for backdrops and scrims. Extensive catalog - check out www.charlesstewart.com.
{Also mention Spags and Building 19.}
The cyclorama needs additional weights at some seams to reduce wrinkles.
Give estimated budgets to the Technical Director for consideration BEFORE the December Board meeting. What will you need to build? Borrow? Rent? Buy?
Back to Quick ListBasic floor plan design should be complete, and reviewed by the Stage Director. Especially note and discuss entrance and exit routes for the cast. Deliver scale plan to Lighting Designer and the Stage Director. This date is important so the Stage Director can begin blocking. Begin to prepare full scale plastic drop sheet of the floor plan to use during rehearsals. Due by the first January rehearsal. PLEASE NOTE: This practice was discontinued after 2001 due to safety concerns. In 2003, only the elevated parts of the set were drawn on plastic, leaving the main floor bare.
Back to Quick ListBasic set design should be complete, and reviewed by the Stage Director. Determine transportation limits: maximum sizes. Review all set piece sizes before construction. (Remember the boat in the basement problem.) For large objects, consider component units, ties with 'tongue in box' connections. Flying scenery requires no perpendicular bracing, takes up less stage space. Use when possible. Scenery may also be split: half hung, half free-standing.
Back to Quick ListRecruit construction crew from the cast - remind them that the set doesn't build itself. If you need people with specific skills, announce this and/or recruit from outside the group.
Back to Quick ListRecruit paint crew from the cast - remind them that the set can't paint itself and (almost) everyone can paint at some level. If you need people with specific skills, announce this and/or recruit from outside the group.
Back to Quick ListThe Playbill Layout Chief will ask for a biography for inclusion in the Playbill. This is generally kept to a single paragraph (6-8 lines).
Back to Quick ListDistribute good quality copies of the set design to Stage Director, Tech Director. Prominently display sketches at construction sessions and rehearsals. Post on the bulletin board.
Back to Quick ListExamine set pieces in storage for usability. This task can be delegated to the Set Construction Chief.
Back to Quick ListPlan acquistion of set materials. Assign responsibilities to individuals: set deadlines; check status weekly. This task can be delegated to the Set Construction Chief.
Back to Quick ListLay in supplies of basic set-building materials, such as nails, glue, wood, cloth, and paint. (Inventory existing supplies first.)
Back to Quick ListSubmit paint and construction crew names to the Tech Director for inclusion in the playbill.
Back to Quick ListThe Producer is responsible for setting for scheduling the Debriefing session, generally held within a month of the show closing. The meeting is to go over the production, focusing on areas of great success and areas which need significant improvement.
Back to Quick ListIf not already turned in, return the task list at the Debriefing Meeting.
Back to Quick List
| Task | Description | Timeframe |
|---|---|---|
| Graphic Design | Work with the Graphic Designer to produce the show "logo". This is used on all advertising, tee-shirts/sweat shirts, tickets, playbill cover, etc. Graphic should give some indication of the stage director's artistic vision. | September, so the graphic can be used in the newsletter to announce the show and auditions. |
OVERVIEW
The Set Designer designs and executes the stage sets for the show, consistent with the Stage Director's visual concept and with any physical, budgetary, or manpower limitations. The Set Designer also recruits the Set Running Crew, in consultation with the Stage Manager.
| Hierarchy | CompleteTaskList | Calendar of Events | Report changes |
| Task | Who Does | Who_Checks | TaskDate | Tied To | Offset |
|---|---|---|---|---|---|
| Background Info for Set design | SetDesigner | TechnicalDirector | 5/1/2003 | FiscalYear | 0 |
| Background for Tech Organization | TechnicalDirector | SetDesigner, LightingDesigner, CostumeDesigner, Producer | 5/8/2003 | MayBoard | 0 |
| Plan organization of technical departments | TechnicalDirector | Producer, SetDesigner, CostumeDesigner, PropsChief, LightingDesigner, MakeupDesigner, StageManager, SoundLiaison | 9/23/2003 | SepBoard | 0 |
| Prepare Blocking Forms | StageDirector | CastManager, SetDesigner | 10/25/2003 | FirstReh | -30 |
| Technical staff meeting | TechnicalDirector | StageDirector, CostumeDesigner, LightingDesigner, MakeupDesigner, StageManager, SetDesigner | 11/11/2003 | NovBoard | 0 |
| Director's First Blocking Rehearsal Cast Notes | StageDirector | CastManager, SetDesigner | 11/24/2003 | FirstReh | 0 |
| Technical staff meeting | TechnicalDirector | StageDirector, CostumeDesigner, LightingDesigner, MakeupDesigner, SetDesigner, StageManager | 12/11/2003 | DecBoard | 0 |
| Recruit Set Painting Crew | SetDesigner | TechnicalDirector | 1/13/2004 | LastPerf | -47 |
| Proof-read biographies for playbill | PlaybillLayoutChief | StageDirector, MusicDirector, Producer, TechnicalDirector, CostumeDesigner, LightingDesigner, MakeupDesigner, SetDesigner | 1/20/2004 | LastPerf | -40 |
| Plan put-in schedule | TechnicalDirector | StageManager, SetDesigner, PropsChief | 2/8/2004 | LastPerf | -21 |
| Recruit Set Running Crew | StageManager | TechnicalDirector, SetDesigner | 2/13/2004 | LastPerf | -16 |
| Finish set details | SetDesigner | TechnicalDirector | 2/15/2004 | LastPerf | -14 |
| Erect set | SetDesigner | TechnicalDirector | 2/15/2004 | LastPerf | -14 |
| Supervise put-in | TechnicalDirector | Producer, StageManager, SetDesigner, LightingDesigner | 2/15/2004 | LastPerf | -14 |